Skip to content

Conversation

def-
Copy link
Contributor

@def- def- commented Sep 22, 2025

Currently experiencing slow Dockerhub pulls

Checklist

  • This PR has adequate test coverage / QA involvement has been duly considered. (trigger-ci for additional test/nightly runs)
  • This PR has an associated up-to-date design doc, is a design doc (template), or is sufficiently small to not require a design.
  • If this PR evolves an existing $T ⇔ Proto$T mapping (possibly in a backwards-incompatible way), then it is tagged with a T-proto label.
  • If this PR will require changes to cloud orchestration or tests, there is a companion cloud PR to account for those changes that is tagged with the release-blocker label (example).
  • If this PR includes major user-facing behavior changes, I have pinged the relevant PM to schedule a changelog post.

@def- def- force-pushed the pr-push-ghcr branch 5 times, most recently from b320f30 to f60c175 Compare September 25, 2025 21:50
@def- def- changed the title builds: Try pushing to GHCR in parallel builds: Try pushing to GHCR in parallel & pull from GHCR in CI Sep 26, 2025
@def-
Copy link
Contributor Author

def- commented Sep 26, 2025

Status: blocked on https://github.com/MaterializeInc/i2/pull/2856
Edit: Unblocked.
TODO: Also for ci-builder.

@def- def- force-pushed the pr-push-ghcr branch 4 times, most recently from 4edc64f to f2fa3c8 Compare September 27, 2025 12:39
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

1 participant