Skip to content

[WIP]

[WIP] #1474

Triggered via push July 14, 2025 11:57
Status Failure
Total duration 47s
Artifacts

abi-cafe.yml

on: push
Matrix: abi_cafe
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 2 notices
abi_cafe (ubuntu-latest, x86_64-unknown-linux-gnu)
Process completed with exit code 1.
abi_cafe (windows-latest, x86_64-pc-windows-msvc)
The operation was canceled.
abi_cafe (windows-latest, x86_64-pc-windows-msvc)
The strategy configuration was canceled because "abi_cafe.ubuntu-latest_x86_64-unkn" failed
abi_cafe (ubuntu-24.04-arm, aarch64-unknown-linux-gnu)
The operation was canceled.
abi_cafe (ubuntu-24.04-arm, aarch64-unknown-linux-gnu)
The strategy configuration was canceled because "abi_cafe.ubuntu-latest_x86_64-unkn" failed
abi_cafe (macos-13, x86_64-apple-darwin)
The operation was canceled.
abi_cafe (macos-13, x86_64-apple-darwin)
The strategy configuration was canceled because "abi_cafe.ubuntu-latest_x86_64-unkn" failed
abi_cafe (macos-latest, aarch64-apple-darwin)
The operation was canceled.
abi_cafe (macos-latest, aarch64-apple-darwin)
The strategy configuration was canceled because "abi_cafe.ubuntu-latest_x86_64-unkn" failed
abi_cafe (macos-latest, aarch64-apple-darwin)
The macos-latest label will migrate to macOS 15 beginning August 4, 2025. For more information see https://github.com/actions/runner-images/issues/12520
abi_cafe (macos-latest, aarch64-apple-darwin)
The macos-latest label will migrate to macOS 15 beginning August 4, 2025. For more information see https://github.com/actions/runner-images/issues/12520